October 25, 2019

Band room ready for concrete

Elevator to the second floor

Entrance to the new building - The office is on the right.  The cafeteria is on the left.  The academic wing is straight ahead.

Entrance to the high school office and principal's office

The hall between the media center and the gym - Trophy cases are built into the walls.

First-floor academic wing - The first door is the entrance to Mr. Lillo's art room.  The second door is the entrance to Mrs. Wheeler's biology room.

Mr. Lillo's art room entrance

Building the stairwell 

Material Storage - Keeps the materials dry and warm out by Holmes Center Road

Media Center

Entering the new building behind the school - The locker room is on the right, and the band room is on the left.

October 15, 2019

Art room and science room doors taking shape


Kitchen

Cafeteria

Cafeteria wall heading into the gym

Cafeteria concession stand and table storage

Hall between the gym and the band room

September 20, 2019

Sunrise over the academic wing as the floor was being poured.

Ag room floors are prepared and ready for concrete.

Membrane roof is being installed on the gym.

View of the cafeteria and kitchen roof from the gym roof


View of the academic wing from the gym roof

The locker room walls are going up.

Gym roof system being installed

September 19, 2019

Getting ready to cut the concrete for hallways and extended learning areas

The crane is setting the girders over the cafeteria.  To the left of the crane, is the kitchen.  All four walls are complete.  The gym is in the background.

September 13, 2019

Hallway between the new gym and the new family and consumer science classroom and band room

Academic Wing - Ready for pouring concrete


View from the firewall looking north - 1/2 the floor for the academic wing ready for concrete


Pouring concrete in the new academic wing

Looking south - Pouring concrete in the new academic wing

Facing north - Concrete in the new academic wing

Early morning pouring of concrete in the new academic wing

September 12, 2019

Facing east, this is a load-bearing wall and the firewall protecting the academic wing.

The entrance to the media center is between the steel columns.  This is next to the new gym, and the old building is in the background.

Girder set over the new cafeteria in front of the new gym

The foreground is the new high school offices.  The background is the firewall to the academic wing.

Inside the new gym - They are ready to finish the roof so we can begin to use it for dry storage.

Academic wing firewall - Looking northeast

Girder set over the new cafeteria

The floor of the academic wing is ready to be poured.  All the underground plumbing is complete.

September 3, 2019

Kitchen walls in front of the gym and girders for the office

August 28, 2019

Finishing the east wall of the gym - Temporary wood framing is around the elevator pit.

Roof in the new gym - This gym is 2000 square feet larger, and the roof is 8 feet high than our current gym.  The windows are facing Old 30.

Girders on the new front entrance of the high school

Girders on the new high school office and front entrance

August 23, 2019

Roof trusses in the new gym

Inside the new gym

August 21, 2019

New windows at the elementary school

East wall of the new gym

East wall of the new gym entering from future cafeteria

West wall of the new gym on the scaffolding 

West wall of the new gym - lockers rooms will be built on the outside

First roof truss set 


August 9, 2019

Bricklayers building the east gym wall

West wall of the gym - The doors lead to the locker rooms.

View from the weight room - North and west walls of the gym

North wall of the gym - Final height is 28 feet.

Brick finish - Top of the North gym wall

August 6, 2019

West wall of the new gym

August 1, 2019

East gym wall

South gym wall going up

July 31, 2019

Gas line to replace the old line that deteriorated

North wall of the new gym - To be built first for dry storage  

July 25, 2019

Scaffolding going up along the north wall of the new gym

July 23, 2019

Soil line behind the current high school building

Northwest corner of the new gym

Northwest corner of the new gym

Elementary school - Outside of the MPR looking towards the office

July 18. 2019

The new windows have been delivered for the elementary school.

The mound of dirt next to the high school building is being moved to the back of the elementary school.  This is the future student parking lot.

The mound of dirt next to the high school building is being moved to the back of the elementary school. This is the future student parking lot.

Future gym

Walls are going up for the education wing.

Block is being delivered, and walls are going up for the education wing.

July 16, 2019

Future art room

Southeast corner and future office

Future education wing and courtyard

Southeast corner and future office

A lion's view looking east

July 11, 2019

Footers for the northeast corner of the new building

Footers for the front entrance of the new building

July 10, 2019

Foundation for new gym, band room, locker rooms, and cafeteria

Foundation for new gym, band room, locker rooms, and cafeteria

July 2, 2019

Elementary Wiring

Footers for the new building

Southwest footers

View from Holmes Center Road

View from Holmes Center Road

Storm sewer near the high school

June 24, 2019

Installation of new exterior doors at the back of the elementary school gym

New doors at the elementary school leading out to the playground

In the elementary school, all the books have been moved to one side of the library so the other side can be a computer lab.

Movement of shelves in the elementary library

The side of the elementary library that is going to be a computer lab.

Movement of shelves in the elementary library

The empty racks for new technology equipment

The running of new wiring for technology in the elementary school

Above the ceiling in the elementary classrooms, a fabricated connection between I-beams to allow movement

An elementary classroom waiting to be painted.

Another elementary classroom waiting to be painted.

Digging the storm drain line between the buildings.

Digging the storm drain line between the buildings.

Storm drain between buildings

Storm Drain - 10 feet down

Covering up the storm drain

Pad for the new building after lime stabilization

Pad for the new building after lime stabilization

Equipment used to do the lime stabilization

June 27, 2019

Building the foundation for the new school gym

Storm drain between the buildings

June 6, 2019

June 4, 2019

May 31, 2019

May 29, 2019